Leading Manufacturer of Storage Systems

Manufacturer of Material Handlings crates & bins, Leading Manufacturer of Storage Systems

Challenges

  • Complex logic for component and parameters selection
  • Slow performance of 3D CAD for large number of parts
  • Drawing of layout and details views
  • Possible errors in selection logic
Benefits:
  • The response time is drastically reduced from 2 days to 15 minutes

KISHOR PUMPS

Manufacturer of centrifugal pumps. Provides custom designed pumping solutions for any pumping requirement.

Client: KISHOR PUMPS

Challenges: 

  • Good number of product variants
  • Very complex Product design calculations.
  • Multiple technical drawings and sheets needs to created for every order
  • Every order requires engineering approvals from customer.

Process Improvement Suggested:

case-study-kishor

Cadec+ Products Suggested:

CADEC+ FOUNDATION
SOLIDWORKS 3D CAD
SOLIDWORKS EPDM

Benefits:

  1. Automated Process of GA creation using CADEC+
  2. Reduction in Design time from 15 days to 2-3 hours.
  3. Completely Person independent
  4. Effortless working with large assemblies
  5. Enhanced our design process due to Structural Designing capabilities of the solution
  6. Efficient and effective data management and collaboration through SolidWorks EPDM
  7. New Product Development now possible

 

 

 

 

 

Horizon Chutes Pvt. Ltd

Manufacturer of fire Doors and steel doors for various architectural and industrial needs.
Challenges
  • Manual errors in design
  • Variety of hardware and other types
  • Nesting and minimizing wastage
  • Designs are person-dependent and time-consuming
Benefits:
Design time reduced from 4 hours to 15 minutes

Dran Engineers Pvt. Ltd.

Manufacturer of welding and machining fixtures and Special Purpose Machines.

Challenge:

  • Person dependent design work
  • Creation of engineering BOM is time consuming and erroneous
  • Every designer models different components, thus there is no standardization
  • Repetitive design work and errors due to that

Benefits

  • Subsystem creation time reduced from 2 hours to 20 minutes

Polyhydron Systems Pvt. Ltd. (PSPL)

Manufacturer of Electro-Hydraulic Systems, Hydraulic actuators, Manifold Assemblies, Special Valves.

Challenges:

  1. Lengthy Design Process
  2. Manifold design was taking a lot of time
  3. Human errors in drafting
  4. Lots of review and rework required
  5. Person-dependent

Benefits:

  1. Design time reduction from 12 hours to 6 hours
  2. Design Accuracy, human errors are eliminated

Rathi Transpower Pvt. Ltd.

Manufacturer of high-quality couplings & components

Challenges:

  1. High number of product variants
  2. Product selection logic was very complex
  3. Every order required engineering approvals from the customer’s side

Benefits:

  1. Guided sales tool is provided to the end customer.
  2. Accurate 3D Models and 2D drawings is created by users on their own.
  3. Engineers team has more time to work on special orders and do more innovation